JIRA rules for architecture/design-only issue

Everything we do is based on development timeframes. A fix version of, say, 16.1.0 means everything done during the development timeframe of 16.1.0. Including designs. We’ve always done this so nothing new here. What’s new is the rule to close design issues.

Thx